Research project · Energiezukunft Fuchstal living lab

The power grid of the future – tested in Fuchstal

“Fuchstal leuchtet” investigates whether a medium-voltage grid supplied exclusively by inverters can be operated stably – without large power plants and without central control.

The research question

Can a grid run on inverters alone?

With the energy transition, wind and solar plants are replacing large power stations. They feed in via inverters and have no rotating masses, which have so far stabilised the grid. The European interconnected grid is expected to reach this situation around 2040.

The Energiezukunft Fuchstal already corresponds to this grid of the future today. This makes it possible to answer questions in real operation that simulations alone cannot.

How can stable grid operation be achieved in practice in a grid without a central control structure that is supplied and loaded exclusively by power converters?

The living lab in figures

Energiezukunft Fuchstal

A battery storage system, a wind farm, a power-to-heat plant with heat storage and the villages of Asch and Leeder form a grid section that can be disconnected from the interconnected grid.

3.35 MWh
Battery storage
2 × 2.9 MW
Grid-forming inverters
4 × 3 MW
Wind turbines
4.7 MW
Power-to-heat with heat storage
20 kV
Medium-voltage grid

Step by step

Three consecutive field tests

Each field test is prepared with simulation models and adds further plants to the island grid – until finally the Fuchstal villages of Asch and Leeder are supplied.

  1. Diagram of field test 1: battery storage, grid-forming inverter, load bank and power-to-heat plant

    Field test 1 · October 2024

    The battery carries the island grid

    Two grid-forming inverters supply the power-to-heat plant, a load bank and a cable section.

    Completed
  2. Diagram of field test 2: four wind turbines added

    Field test 2 · 16–18 September 2025

    The wind farm joins in

    Grid-forming and grid-following plants working together – three days of stable island grid operation.

    Completed
  3. Diagram of field test 3: the villages of Asch and Leeder added

    Field test 3 · 23–27 November 2026

    Asch and Leeder in the island grid

    The villages of Asch and Leeder are disconnected from the power grid for half a day and supplied as an island grid – the practical proof for the grid of the future.

    Planned
View across meadows to Fuchstal with a wind turbine in the background

News

News from the project

Harmonics in the island grid

At the 25th Wind & Solar Integration Workshop in Porto, TU Braunschweig shows how grid-forming inverters damp voltage harmonics – with measurement data from the Fuchstal island grid.

To the publications

Strategies against inrush currents

The results of the second field test on transformer inrush currents were presented at the Hybrid Power Plants & Systems Workshop in Sardinia.

More on field test 2

Safe experiments in living labs

How risk management safeguards the field tests is shown in the contribution by Munich University of Applied Sciences to the Symposium Energieinnovation in Graz.

To the press release

First field test successful

On 2 October 2024, the island grid ran exclusively on the grid-forming battery inverters for the first time – 15 parameter scenarios were tested.

More on field test 1

Consortium

Working together on the grid of the future

Munich University of Applied SciencesInstitute for Sustainable Energy Systems (ISES)
Augsburg Technical University of Applied SciencesFaculty of Electrical Engineering, High Voltage Laboratory
TU Braunschweigelenia Institute for High Voltage Technology and Power Systems
Funded by the German Federal Ministry for Economic Affairs and Climate Action on the basis of a decision by the German Bundestag

The project “Fuchstal leuchtet” is funded by the German Federal Ministry for Economic Affairs and Climate Action (BMWK) on the basis of a decision by the German Bundestag.