Harmonics in the island grid
At the 25th Wind & Solar Integration Workshop in Porto, TU Braunschweig shows how grid-forming inverters damp voltage harmonics – with measurement data from the Fuchstal island grid.
To the publications
Research project · Energiezukunft Fuchstal living lab
“Fuchstal leuchtet” investigates whether a medium-voltage grid supplied exclusively by inverters can be operated stably – without large power plants and without central control.
The research question
With the energy transition, wind and solar plants are replacing large power stations. They feed in via inverters and have no rotating masses, which have so far stabilised the grid. The European interconnected grid is expected to reach this situation around 2040.
The Energiezukunft Fuchstal already corresponds to this grid of the future today. This makes it possible to answer questions in real operation that simulations alone cannot.
How can stable grid operation be achieved in practice in a grid without a central control structure that is supplied and loaded exclusively by power converters?
The living lab in figures
A battery storage system, a wind farm, a power-to-heat plant with heat storage and the villages of Asch and Leeder form a grid section that can be disconnected from the interconnected grid.
Step by step
Each field test is prepared with simulation models and adds further plants to the island grid – until finally the Fuchstal villages of Asch and Leeder are supplied.

Field test 1 · October 2024
Two grid-forming inverters supply the power-to-heat plant, a load bank and a cable section.
Completed
Field test 2 · 16–18 September 2025
Grid-forming and grid-following plants working together – three days of stable island grid operation.
Completed
Field test 3 · 23–27 November 2026
The villages of Asch and Leeder are disconnected from the power grid for half a day and supplied as an island grid – the practical proof for the grid of the future.
Planned
News
At the 25th Wind & Solar Integration Workshop in Porto, TU Braunschweig shows how grid-forming inverters damp voltage harmonics – with measurement data from the Fuchstal island grid.
To the publicationsThe results of the second field test on transformer inrush currents were presented at the Hybrid Power Plants & Systems Workshop in Sardinia.
More on field test 2How risk management safeguards the field tests is shown in the contribution by Munich University of Applied Sciences to the Symposium Energieinnovation in Graz.
To the press releaseOn 2 October 2024, the island grid ran exclusively on the grid-forming battery inverters for the first time – 15 parameter scenarios were tested.
More on field test 1Consortium
The project “Fuchstal leuchtet” is funded by the German Federal Ministry for Economic Affairs and Climate Action (BMWK) on the basis of a decision by the German Bundestag.